• Twitter
  • Facebook
  • Google+
  • LinkedIn
  • YouTube

Products

Contact Us

GN Solids America LLC

Tel:+1 (713) 377-2984

Tel:+1 (713) 518-2368

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Add:6710 Windfern Road, Houston, TX 77040,USA

 

TBM Slurry Separation Plant

In modern tunneling construction, particularly in TBM and Pipe Jacking projects, large volumes of slurry mixed with sand and stones are generated. Effective separation of these solids is essential—not only to protect the environment but also to recycle water and reduce operational costs.
  • Description

    In modern tunneling construction, particularly in TBM and Pipe Jacking projects, large volumes of slurry mixed with sand and stones are generated. Effective separation of these solids is essential—not only to protect the environment but also to recycle water and reduce operational costs.

    GN's TBM Slurry Separation Plant offers a comprehensive solution for solid-liquid separation, ensuring high efficiency, compact design, and adaptability to various project scales. With a strong focus on sustainability and performance, our systems are widely used in urban infrastructure projects where space is limited and environmental compliance is critical.

    GN TBM Slurry Separation Plant Key Features

    • Turnkey Solutions – Fully integrated systems designed for plug-and-play operation.
    • Modular & Compact Design – Pre-assembled modules with a small footprint for easy transport and fast on-site setup.
    • 5-Phase Separation Process – Ensures finer solids removal and clearer water output.
    • High Flexibility – Systems can be combined to handle both small and large flow rates.
    • Easy Disassembly & Relocation – Ideal for projects requiring frequent movement between sites.

    GN TBM Slurry Separation Plant Models

    Model Capacity Application
    GNTBM-260B 260 m³/h Middle/Large TBM Construction
    GNTBM-360B 360 m³/h Middle/Large TBM Construction
    GNTBM-500B 500 m³/h Middle/Large TBM Construction

    Modular System Combinations

    GNTBM-800B = GNTBM-360 + GNTBM-500
    GNTBM-1000B = GNTBM-500 + GNTBM-500
    GNTBM-1500B = 3 × GNTBM-500
    GNTBM-3000B=6× GNTBM-500

    How It Works(GN TBM Slurry Separation Plant)

    1. Primary Screening – Slurry enters the double-deck shale shaker, where large particles like stones and gravel are removed.
    2. Slurry Pumping – The screened slurry is pumped to the desander or desilter for further processing.
    3. Desanding / Desilting – Clean mud overflows from the top for reuse, while solid particles are discharged from the bottom and dewatered.
    4. Final Discharge – Dried solids are removed from the system, and clean water or mud is recycled for tunnel construction use.

    Industry Applications

    • Urban Tunneling
    • Pipe Jacking Projects
    • Underground Construction
    • Environmental Remediation
    • Water Conservation Systems

    Why Choose GN TBM Slurry Separation Plant?

    With decades of experience in solids control and slurry separation, GN provides reliable, high-performance equipment tailored to the demanding needs of modern tunneling. Our systems are engineered to maximize efficiency, minimize environmental impact, and adapt to the unique challenges of each project site.

  • YOUR CONTENT CODE FOR REVIEWS/COMMENTS GOES HERE
  • YOUR CONTENT CODE FOR RELATED PRODUCTS GOES HERE

Contact Us

Fields marked with ( * ) are required.

 
×

Contact us

By submitting this form, you accept our privacy policy.
×

Login

  or   Create an account

Forgot your password? |  Forgot your username?

×
×

WS Register



  or   Login
×

Subscribe to Our Newsletter

×